Add to Favorites | Chinese
Position:home>Market>
Stone lion pilot a ship into a harbour 2 period the project is obtained batch
From;    Author:Stand originally

Stone lion pilot a ship into a harbour 2 period the project is obtained batch

On October 28, 2008 02:00 Channel Metropolis Daily

Hua Jian of reporter of N our newspaper

Pilot a ship into a harbour of lion of stone of report from our correspondent 2 period project feasibility considers to report the hair that capture a province changes appoint give an official. Reporter yesterday understands from company of stone lion water supply, this project investment adds up to 600 million much, among them investment of stone lion municipal government is controlled 250 million yuan, bank loan is controlled 374 million yuan.

Natural resources of water of stone lion average per capita has a quantity to be 312 stere, it is the 1/5 of city of state of the 1/10 that natural resources of water of Fujian Province average per capita measures, spring only. As the development of stone lion economy, water supply demand increases quickly, the issue that lack water is outstanding with each passing day.

Be in early 2001, the first phase project of draw or channel water of stone lion town that already built, alleviated greatly the stone lion city's serious problem that lack water. Company of stone lion water supply assistant president introduces, form an industrial development littoral in recent years, quantity of water supply of whole town day increases 420 thousand tons, water supply dimensions has achieved first phase project of draw or channel water of stone lion town to exceed long-dated design even, shortage of water natural resources is sure to become the “ bottleneck ” that restricts stone lion economy to develop further, this makes draw or channel water of stone lion town 2 period the project plans no time to delay.

Company of stone lion water supply discloses, pilot a ship into a harbour 2 period the project is full-length 32 kilometers, project scope is pilot a ship into a harbour 4.6 stere / second, water intake is set in Yuan Naan golden pheasant to bar river brake upper reaches arranges 200 meters of place, water supply dot plans to be built in auspicious Zhi to press down the bare lake to highway of lion of area under administration, stone water works. According to introducing, project content basically includes to take bridge of water hub, pumping station extraction water, cop is defeated by water, steel tube is defeated by water to wait build thing, use conduit of glass reinforced plastics of double-barreled DN1600 millimeter to be defeated by water.

Be defeated by waterline road trend to be: Brake of Na Anjin chicken takes the city zone of carp of — of water pumping station — of tall trunk canal builds golden pheasant to bar south prosperous highway — Jiang Daqiao of bamboo shoot of river brake — (south bank) — pricks tung big bridge (south bank) — advance Jiang Daqiao.
Previous12 Next

About us | Legal Notices | Sitemap |Links| Partner